We use our own and third-party cookies to improve browsing and provide content of interest.

In continuing we understand that you accept our Cookies Policy. You can modify the cookies storage options in your browser. Learn more

I understand

News

Manage and control the maximum demand with the new MDC series

on .

Due to the constant increase of the electricity price, all types of customers must find new formulas to reduce their electricity bill. To succeed in this, we are presenting our new power management system to control the maximum demand: MDC series (MDC 4 and MDC 20)

FNov MDC

The main objective of the new CIRCUTOR MDC series is to manage and control the maximum demand of an installation. To achieve this objective, the device connects and disconnects some loads (non-critical ones) to ensure that the maximum demand will never be higher than the contracted power, avoiding electricity bill surprises. Moreover, the extended MDC 20 range, allows a tariff control to adjust the loads for being connected on periods with lower price, avoiding high consumptions due to loads simultaneity during high tariff price periods.

 

More information: New MDC series to manage and control the maximum demand

 
 

Article: How to avoid maximum demand penalties in your electricity bill

 

circutor32x32

Contact

CIRCUTOR, SA
Vial Sant Jordi s/n, 08232
Viladecavalls (Barcelona) Spain
Tel: (+34) 93 745 29 00
Fax (+34) 93 745 29 14

Technical Support

(+34) 93 745 29 19

SAT

© 2015 circutor.com. All rights reserved.