WiBeee: Your consumptions in the palm of your hand

 

An efficiency expert always with you

In the current era of information, energy consumers must be able to obtain data on their electrical consumption, in order to be able to take action to improve the energy efficiency of their installations and to make substantial savings in their electricity bill.

Likewise, due to the difficulty of obtaining consumption data from the installed electronic meters, users do not have the chance to react before receiving their electricity bill.

To help us therefore understand how we consume energy and how to reduce consumption, CIRCUTOR is launching one of the most innovative products on the market in recent years: Wibeee.

 


 

What is Wibeee?

Wibeee is a consumption analyzer (single-phase or three-phase), which uses a Wi-Fi wireless connection for obtaining electrical data to facilitate decision-making when it comes to understanding the use of electrical energy.

The unit can be attached to any part of the installation, which helps you to detect any problematic points where energy is not being used efficiently, thus making a significant contribution to the reduction of energy consumption via the remote activation of alarms when the desired limits are surpassed.

In short, Wibeee is the ideal tool to make your electrical installations efficient, for finally taking control and deciding where to spend your money. Finally, a device with personality. Wibeee displays everything you couldn't see before.

  FA-WIBEEE-buen-trabajo-en

Once connected via Wi-Fi, you can immediately access the instantaneous data using your smartphone, tablet or PC, which allows you to view your electrical consumption in real time. In addition, Wibeee also sends all of the data to a server in the cloud server so that you can view and compare the various past consumption logs in a user-friendly manner.

With Wibeee you will no longer get a surprise with your electricity bill, learning to manage your consumption in a simple way.

Cable-free. Wireless system

 

Accurate measurement

Wibeee. Cable-free. Wireless system

  Wibeee. Accurate measurement
The entire system has been designed to monitor information over wireless communications networks. Nothing can come between Wibeee and you.  

You may be thinking that such a simple installation could result in loss of measurement accuracy, but that is not the case. Wibeee has a minimal error percentage and so is able to maintain the measuring guarantee that CIRCUTOR units have always been known for.


 

How will it help you?

Wibeee shows you the instantaneous and past electrical consumption data using any smartphone, tablet or PC, with the help of its integrated web server or via the free Wibeee Circutor app, available for iOS or Android. In other words, it enables a direct Wi-Fi connection so that you can view your data.

It is also possible to configure the consumption analyzer so that it sends the data automatically to a cloud server in order to log the data. With Wibeee connected to the Internet, you can view instantaneous and past data using your smartphone or via alerts configured by your smartphone. Connect to the web platform to consult your data, carry out analyses, configure your user profile, etc. The logs of the analyzer in the cloud are also fully integrable with any platform on the market.

Wibeee is therefore the ideal tool for making your electrical installation efficient, controlling and showing your savings and helping you to take the right decisions in terms of managing energy efficiency.

Consumption control, electrical savings

 

Comparisons are not tedious

Wibeee. Consumption control, electrical savings

  Wibeee. Comparisons are not tedious
Wibeee collects the necessary data on electricity consumption and helps you interpret them, know your consumption profile and save on your energy bill.  

Wibeee lets you analyse your installation(s) by making comparisons between more than one Wibeee or between different periods of time, if you wish. It lets you confirm that the actions you take for energy savings are getting their expected results.


 

It couldn't be easier to install, it's as simple as putting a magnet on your fridge!

The installation of any electrical metering unit can be a complicated task as it requires wiring space and time. Wibeee is extremely easy to install: in ten seconds it's done.

Our technology, which is attached via a clip, is based on the patented system DINZERO and consists of attaching the unit easily to the cable or simply to the upper part of an MCB (miniature circuit breaker). Once switched on, it will begin to convert the measured parameters into information that can be sent via a wireless connection.

Complex installations

 

Installing Wibeee

Avoid complex installations with Wibeee

  Installing Wibeee
Other systems require cabling of devices in small spaces with loss of accuracy and danger of electrocution.  

Just remove it from the box and place it near the switch. No transformers and auxiliary receivers and with the required precision.

Patented system. New technology

   

Wibeee. Patented system. New technology

  Wibeee. Patented system. New technology

DIN-Zero DESIGN
Wibeee takes up no space. It's true.
No space in your electric switchboard.

 

CONNECTION-Zero
It fits perfectly in any electric switchboard with absolutely no cabling.

 


How can you interact with Wibeee?

Wibeee logs the electrical parameters of the installation so that you can view them from wherever you want: from the computer in your office, via smartphone from the café on the corner or from your tablet lying on your sofa at home. Wibeee can also be integrated with the other devices that are compatible with the PowerStudio SCADA system.

The data will be logged in CIRCUTOR's cloud server or can be sent to your own local server, giving you the option of choosing the system that best meets your needs. Once the data has been logged, you can then access it via the following means:

Wibeee logs the electrical parameters of the installation

LOCAL

 

CLOUD

Device built-in web application for configuration and data monitoring. Query using the device's IP.

 

Web server application with database in the cloud. Query via wibeee.circutor.com

MOBILE

 

PowerStudio SCADA

Application specially designed to be used on Android and iOS mobile devices. Consumption control from everywhere.

 

Compatible with the management and data monitoring system. Can be integrated with the other units in your installation.

App Wibeee CIRCUTOR. Take control from your smartphone and tablet

The Wibeee Circutor app is used to register all of your Wibeee units to be installed, as well as to monitor consumption and other electrical variables in real time, or to view past data logs that the units have been logging in the cloud.

Wibeee Circutor allows you to connect your smartphone or tablet to the SSID network of each Wibeee, which will display some simple graphical steps showing you how to install the units, add them to groups and subsequently monitor them.

App Wibeee CIRCUTOR

Once the unit has been configured, you can control it from any point in the installation, with no effort whatsoever, being able to check the status of your installation, past consumption and alerts such as excessive consumption of reactive energy, tripping of protection elements or faults in the capacitor bank.

App Wibeee CIRCUTOR

DOWNLOAD THE APP:

   

Download App Wibeee

 

Descarga App Wibeee 

Wibeee CIRCUTOR portal. Take control from your PC

Once you have installed the Wibeee consumption analyzer, it will begin to send data to the cloud server. This data will be stored there so that you can view it at any time without needing to be connected to your own unit. You can also configure the unit via the web portal, generate alarms or compare consumption data with other Wibeee analyzers that you have installed.

Wibeee CIRCUTOR Portal

Once registered on the platform, you can access the various screens for managing and comparing your consumption data.

Individual management

The web platform shows you a general summary of consumption (energy, CO2 emissions and cost in euros), with the option of creating an alarm for excessive consumption.

You can also view incremental graphics of active power, cost and emissions (as well as exterior temperature from an external server) for any period, as well as being able to export the data in Excel format and view a summary of costs for the selected period.

General summary of consumption with Wibeee

From the web portal you can also view data logs for electrical variables such as: voltage, current, apparent power, active power, reactive power, active energy, reactive energy, frequency and power factor in any period.

View data logs for electrical variables with Wibeee

Comparisons

Once the different Wibeees have been registered, you can make comparisons between them to see which is the most efficient and what level of consumption is being logged by each one. This feature is incredibly useful in installations with a similar topology as the one that manages energy the best can serve as an example for the rest, helping to change bad usage habits.

In addition, if you install a number of Wibeee analyzers in one installation, you can segment the consumption data by use (lighting, air conditioning, power etc.) and check how and when you consume energy.

Control of devices with Wibeee

 

 

 

For more information, please do not hesitate to log on free of cost to our Wibeee portal:

wibeee.circutor.com

 

 
 

Consumption analyzer WIBEEE (datasheet, manual, catalogue, etc.)

 

您可以获取最新资讯最新资讯
您也可以关注我们的公众账号CIRCUTOR的 Twitter账号, 以及LinkedIn.

晶闸管电容柜:实例

 

For many years now, power factor correction has been one of the first steps to improving the energy efficiency of installations. Since their beginnings, compensation techniques have grown and developed over the years, adapting to new needs (basically the types of loads that must be compensated) and to new technologies that have become available.

At first, the most common compensation technique was to use capacitor banks with contactor operation. This compensation system is optimal for balanced systems and to compensate loads with connection and disconnection rates that are not too fast, on the order of seconds, and it is currently the most common system in most installations despite increasing numbers of unbalanced installations.

The passage of time and the growing use of more dynamic loads in many installations has led to the emergence of a new technique: the use of static contactors (solid-state relays or thyristors) to operate the capacitors in a capacitor bank. This technique has a set of important advantages over compensation with contactor operation:

  • Response speed: the use of thyristors enables compensation in installations with highly fluctuating load variations (in cycles, on the order of ms), making it the optimal solution for cosφ correction of very fast loads. The paradigmatic case would be the compensation of welds, although lifts, freight elevators, compressors, etc. would also be on the list of likely loads.
  • Elimination of mechanical wear: contactors have a limited mechanical life, which incurs the need for regular maintenance to ensure the capacitor bank is functioning properly. The use of thyristor operation eliminates this need, extending the useful life of the capacitor bank assembly and reducing maintenance costs.
  • Less noise: the use of electronics during contactor operation eliminates mechanical noises generated by the contactors, which can become an annoyance in service installations.
  • Elimination of connection transients: the use of zero switching control boards ensures the elimination of transients when the capacitor connects, giving it a longer useful life and eliminating disturbances on the electrical network.

In the early days of this new technology its main drawback was its high price, which meant that investing in this type of unit necessitated long repayment periods for most companies, making it difficult to justify the expenditure, even more so if compared to traditional compensation with contactors.

FO OPTIM EMS-C 250x250

CIRCUTOR was a pioneer in developing the technology used in static capacitor banks and has included them in its catalogue for more than 20 years, making the company a leader in this technique within the electricity market. In recent times, significant R&D efforts have been made to adapt the new emerging technologies to this compensation technique, developing a new range of static capacitor banks that drastically reduce the price difference between the two compensation systems (contactors / thyristors), thus eliminating the main obstacle to choosing a static capacitor bank as a compensation method.

To this end, CIRCUTOR has launched the new range of EMS-C static capacitor banks which are ideal for industrial applications, such as arc welding, compressor start-up, cranes and hoists. But they are also suitable for the service sectors, such as compensating lifts in communities of residents, given that the traditional contactor technique does not compensate them well due to their quick input and output rate.

Thanks to minimising the cost difference between classic compensation with contactors and advanced static compensation, CIRCUTOR has turned the choice of a static capacitor bank from a technical whim to a tangible reality within the reach of all budgets.

 

More information about 低压自动补偿电容柜

 
 

Documentation about Automatic capacitor banks

 

您可以获取最新资讯最新资讯
您也可以关注我们的公众账号CIRCUTOR的 Twitter账号, 以及LinkedIn.

数据中心如何提高电能效率 (DPCs)

 

The importance of knowing the PUE. Managing effective energy use

We can calculate the energy efficiency of any production system by comparing the useful energy with the total energy needed by the system. With this information and knowing where the inefficiencies are, we can achieve substantial savings and more environmentally friendly operations.

As a practical example, an average data processing centre with installed power of 100 kW can achieve savings of €8,000 to -€16,000 in the electricity bill as a result of improved energy efficiency. To do so, it is as important to detect the points of consumption as it is to assess the corrective measures.

The energy factor is so critical in data processing centres that it has its own indicator: PUE or Power Usage Effectiveness, defined by a standard issued by The Green Grid, a global environmental agency comprised of over 175 internationally renowned companies.

The European Commission also has a code of conduct for reducing the impact of data centres' growing energy consumption.

It periodically publishes best practices for data processing centres, most recently in 2013.

  FA-CPD-code-conduct

These centres have a peculiar profile due to their uninterrupted working hours. Because of the great importance of service continuity when powering servers, computers and communications, they have three main groups of units for their exclusive use:

  • Energy supply and control units (electricity and other sources, such as diesel oil, gas, etc.) essential for the functioning of these continuous operation units. This group includes supply connections and switchboards, lighting and refrigeration systems, air conditioning of the corresponding rooms, etc.
  • One or several units to supply power computer equipment (IT), comprised of UPS (Uninterruptible Power Supply) units .
  • The distribution panels and systems for this energy to power the computer equipment.

Broadly speaking, we can say that of the 100% total energy consumed in a DPC, 60% corresponds to the infrastructure's electrical consumption and the remaining 40% to refrigeration systems.

So we can undoubtedly see the need for coefficients (PUE) that make it possible to prepare comparative studies aimed at determining actions for optimising the energy consumption of these centres.

Calculation guidelines

As we have already seen, we normally use the standard issued by The Green Grid to calculate the parameters for DPC efficiency. We will distinguish two key indicators:

1. PUE: Power Usage Effectiveness, calculated with the formula:

FA-CPD-formula-1-en

2. DCE: Data Centre Efficiency, calculated as a percentage with the formula:

FA-CPD-formula-2-en

In addition, the Environmental Protection Agency of the United States (EPA) provides the following PUE values as a reference:

  • Historic 2.0
  • Current trend 1.9
  • Optimised operations 1.7
  • Best practices 1.3
  • State-of-the-art 1.2

Companies like Google have gotten the average PUE of their DPCs down to 1.22, and sometimes as low as 1.15.

In the historic frame of reference (PUE 2.0), typical consumption for different DPC elements is:

FA-CPDs-desglose-EN

Therefore, one of the keys to the success of an energy improvement project is measuring the consumption of each unit type in order to be able to recognise the most affordable areas of improvement.

There are three general measurement levels* shown in the table below, with measuring points that correspond to the indicators in the diagram also shown below, with energy measured in kWh. A 12-month cycle is taken as a comparative reference for all levels.

There is also a Level 0, which only includes power measurements (kW), measuring the general demand of the installation and that of the UPS output.

measuring the general demand

FA-CPDs-escala-EN

CIRCUTOR with its decades of experience in energy efficiency, solutions, offers a wide range of products that facilitate continuous data gathering for controlling PUE and DCE, UPS unit performance, electric energy management and DPC maintenance. These include energy meters, power analyzers, ultra-immunised earth leakage protection, harmonic filtering systems, PowerStudio Scada management software and power factor correction systems.

CIRCUTOR’s Solution with the SCADA system

For the study, two implementation phases and a third study phase are required:

  1. Measurement: with the addition of CVM power analyzer units, with their corresponding current transformers, equipped with RS485 serial communications to measure circulating energy.
  2. Analysis: installing the PowerStudio Scada application, calculating and viewing the resulting values and running the corresponding reports.
  3. Improvements: analysing the collected data lets us see which units are consuming.

FA-CPDs-fases-EEE-EN

The application features:

A start screen in single-line diagram format (Fig.1) with data corresponding to all the concurrent energy types (converted to KWh).   single-line diagram
A second summary screen (Fig.2) with performance calculations (Fig.3), enabling you to create and display reports with results for different periods (daily, weekly, monthly and yearly).    performance calculations

By way of example, here are the screens displayed when installing CVM analyzers and programming a specific Scada application.

On the first one you can see the installation diagram and unit connections; on the second one you can see the resulting data online for a single DPC; and on the third one is a weekly Level 1 report with continuous measuring frequency.

   Weekly PUE calculation report
CIRCUTOR’s Solution with a local display screen

For the study, two implementation phases are required:

  1. Addition of CVM power analyzer units with their corresponding current transformers, equipped with RS485 serial communications to measure circulating energy.
  2. Addition of an EDS energy controller with storage and data processing functions and its built-in programming, along with a local display screen.

By way of example, here is the communication topology displayed when installing CVM analyzers, the EDS energy controller and the local display screen.

Solution with a local screen

How to improve the efficiency of a data processing centre

To improve the efficiency of a data processing centre, we must follow measuring and analysis by implementing improvement actions. There are actions that do not require any investment, such as reducing the contracted power to save on direct costs, and other actions that do require investment, such as replacing units with more efficient ones.

To organise these improvement actions you can prioritise them in accordance with the efficiency that can be achieved with each one. This prioritisation is calculated by comparing the improvement obtained with the investment required to make the improvement.

Action priority   

Pa: Action priority
CEa: Current energy consumption
CEm: Energy consumption with the new measure.
Investment: investment needed to achieve the savings

Performing this calculation for each possible improvement action helps us prepare a list of actions and sort them from highest to lowest priority.

Possible short-term measures include:

  • Analysing usage patterns for the environments where they have been deployed.
    • Calculating the minimum server group sizes to maintain service levels.
    • Switching off unused capacity, as long as proper availability is maintained.
  • Virtualisation and consolidation
  • Replacing hardware
    • Virtualising test environments.
    • Replacing obsolete hardware.
  • Changes in room management
    • Correct control and adjustment of room temperature.
  • Changes to the refrigeration infrastructure.
    • New efficient refrigeration machinery.
    • Hot aisle/cold aisle layout.
    • Elimination of "gaps" in the racks.
    • Future: use of outside air.
  • Lighting optimisation

For a more thorough list of Data Centre improvements, see the "2013 Best Practices issued by the European Commission's Renewable Energies Unit."

Conclusions

DPCs (Data Processing Centres) are major consumers of electrical energy and their consumption can be divided in useful energy for computer equipment and the additional energy necessary for their smooth functioning. This energy consumption is so critical that it has its own indicator: PUE (Power Usage Effectiveness).

In DPCs with non-optimised PUEs, this additional energy can account for up to 50% of the total energy, giving us good room for improvement. According to minimum availability requirements and the options for investment in improvements, savings of up to 20% of the total energy consumed can be achieved (or between €8,000- €16,000 a year in an average 100 kW DPC).

As we have seen in this article, it is possible to study and measure possible improvements to data processing centres. The key phases are installing energy measuring units, analysing the data gathered and making decisions based on that analysis.

CIRCUTOR, with its decades of experience in energy efficiency solutions, offers a wide range of products that facilitate continuous data gathering for control, maintenance and energy efficiency management of DPCs.

 

Click here to download this document in PDF format pdf : es  en  de

 
 

Consult our 数据处理中心。成功案例

 

联系我们:
t. (+34) 93 745 29 00
 

电能效率自损耗和电动汽车充电系统

 

The perfect formula to improve the sustainability of companies

The agreement signed in February 2014 between FEC (Future Energy Consulting Services GmbH) and CIRCUTOR to promote and develop activities related to marketing energy efficiency and solar energy solutions has begun to see results.

This first year of working together has resulted in the development of three projects that deliver the perfect combination of environmental sustainability, economic viability and social outreach for companies as varied as a car dealership and a vegetable processing and packing plant in Southern Spain.

The FEC group includes the development company PROCONSULT and the SOLAREC engineering company specialised in implementing solar energy systems. They have both worked with CIRCUTOR on the design, construction and start-up of the first three projects of a long list that will be refined in the upcoming months.


PROCONSULT's solutions for companies come together under the term SUN TOWER, which encapsulates the concepts of:

  1. Improved building energy efficiency through the implementation of an energy monitoring application with POWER STUDIO SCADA.
  2. Harnessing the building's potential for energy self-production through the installation of photovoltaic solutions like the SUN TOWER solar tracker, rooftop solar systems and CIRCUTOR's PVing Park photovoltaic canopies.
  3. Adapting the building for the arrival of electric vehicles through the installation of CIRCUTOR's RVE2-P charging points in a solar parking area.

The solution is backed by a guarantee to offer each client the best solution adapted to their consumption needs and available spaces. Mature solutions, proven technology and suppliers with financing available. This means that projects can be undertaken by companies with confidence that resulting savings will offset the investment made and that financing is guaranteed.

Energy costs currently account for a high percentage of company spending, with the added uncertainty that future instability could jeopardise competitiveness. The strength of these solutions is that they allow the building to use sunlight to generate between 30 and 50% of the energy required on-site and reduce energy requirements to a minimum with consumption monitoring that makes it possible to define actions to be implemented and quantify their results.

PV system can add around  50% the energy demand
PV system can add around
50% the energy demand

All these projects have been formalised under the heading of photovoltaic energy installations connected to the grid with zero injection of surplus energy. This formula significantly eases the administrative requirements of solar installations designed for the self-sufficiency of buildings. The system aims to reduce internal electricity consumption, achieve energy independence, and generate energy locally, not for injection into the distribution lines.

The solar production is regulated through the Dynamic Power Controller (CDP) designed by CIRCUTOR. This device sends a power modulation order to the solar system inverters so that they adapt the generated power to a maximum value that is always less than the instantaneous power demanded by the loads in real time.

The fact that self-consumption photovoltaic systems produce part of the energy required by buildings and do not inject surpluses into the grid allows government to assign them an energy savings role, facilitating their processing. Likewise, having no grid injection frees these systems from maximum installable power restrictions based on the discharge capacity of the distribution lines.


The term SUN TOWER broadly encompasses the implementation of PowerStudioScada energy management software, solar tracker systems, rooftop systems and CIRCUTOR's PVing Park photovoltaic canopies, as well as RVE2-P quick charging points for electric vehicles.

The term SUN TOWER broadly encompasses the implementation of PowerStudioScada energy management software, solar tracker systems, rooftop systems and CIRCUTOR's PVing Park photovoltaic canopies, as well as RVE2-P quick charging points for electric vehicles.


Solar photovoltaic systems for selfconsumption with zero injection into the grid are supported by a growing number of governments that provide for legal installations in a simple, quick and economical way without the need for prior approval processes with the utility companies.


The integration of all the activities from the various projects into a single platform through the POWER STUDIO SCADA monitoring and supervision application allows you to not only quantify the solar production of each of the systems, but also tracks the evolving consumption of each productive section of a company as well as the impact of the different energy savings actions that have been implemented.

The integration of all the activities from the various projects into a single platform through the POWER STUDIO SCADA monitoring and supervision application allows you to not only quantify the solar production of each of the systems, but also tracks the evolving consumption of each productive section of a company as well as the impact of the different energy savings actions that have been implemented.


The SCADA application enables SOLAREC to perform corrective and preventive maintenance in order to guarantee the results of each of the projects as well as design future energy strategies for each user.

By performing simulations to generate the energy bill and calculate the impact of the savings provided by solar production, you can verify the profitability of investments as well as the specific energy costs of each business process in every industry. The design and implementation of the POWER STUDIO application as well as the electrical installations required for these projects have been carried out by CIRCUTOR's expert engineering and installations company, Aseprel, SL (www.aseprel.es)

The installation of the RVE2-P electric vehicle charging points in the projects not only conveys an image of modernity and environmental commitment to employees and customers of companies, but also serves to adapt the infrastructure to new transitional energy regulations centred on mobility, like the recently-approved ITC-BT-52 of the Low Voltage Electrotechnical Regulation.

The 246 kW of rated power installed in the three completed projects have an annual production potential of nearly 400,000 kWh. This would mean approximate energy savings of €80,000/year and a reduction of 90 tonnes of greenhouse gas emissions into the atmosphere each year. Moreover, the three QUICK charging points for electric vehicles will provide the basis for a provincial infrastructure that will enable the development of these vehicles, resulting in greater cost reductions and emissions in the years to come.

These projects have undoubtedly positioned the companies of the FEC Services group at the forefront of solar energy technology in buildings and as a sector leader in Southern Spain. This has paved the way for the group to win more projects and expand its activity to other areas with identical needs and great potential for savings.

Based on the experience gained in these first projects, now in operation, FEC Services and CIRCUTOR are working to adapt this partnership scheme to Latin American countries where there is a great need to provide solutions in energy efficiency, self-consumption of solar energy and the integration of electric mobility. The first projects are underway in Mexico and Chile.

For contact details and more information: www.proconsult.es


Information on completed projects:

  • Client: Premium Almería
  • Actions taken:
    • PowerStudioScada software application
    • Installation of a SUN TOWER solar tracker
    • Installation of PVing PARKS photovoltaic canopy with 4 parking spaces
    • Installation of RVE2-P electric vehicle charging point.
  • Photovoltaic power installed: 21 kW
  • Roll-out: June, 2014
  • Location: Huércal, Almeria (Spain)
Premium Almería
  • Client: Frutas Escobi
  • Actions taken:
    • PowerStudioScada software application
    • Installation of a SUN TOWER solar tracker
    • Installation of PVing PARKS photovoltaic canopy with 8 parking spaces
    • Installation of rooftop solar system
    • Installation of RVE2-P electric vehicle charging point.
  • Photovoltaic power installed: 60 kW
  • Roll-out: September, 2014
  • Location: El Ejido, Almería (Spain)
Frutas Escobi
  • Client: Hortofrutícola Las Norias
  • Actions taken:
    • PowerStudioScada software application
    • Installation of a SUN TOWER solar tracker
    • Installation of PVing PARKS photovoltaic canopy with 54 parking spaces
    • Installation of rooftop solar system
    • Installation of RVE2-P electric vehicle charging point
  • Photovoltaic power installed: 165 kW
  • Roll-out: January 2015
  • Location: El Ejido, Almería (Spain)
Hortofrutícola Las Norias

 

 

Click here to download this article in pdf PDF formates  en  de  fr  pl  pt

 
 

More information about Smart electric vehicle charging system

 
 

More information about Renewable energies

 

您可以获取最新资讯最新资讯
您也可以关注我们的公众账号CIRCUTOR的 Twitter账号, 以及LinkedIn.

欧盟电能效率审计指令:公司责任以及这一领域机遇

 

欧盟2012年10月25日指令2012/27/EU颁布截止至2015年12月5日,成员国内的所有公司必须通过有资质的和/或认证专家实行独立的电能审计。

通常,需要遵守指令的公司为:
  • 拥有超过250名员工以及年营业额超过5千万欧元的公司。
  • 年度资产负债表达到4千3百万欧元的公司。

此外,该指令指出成员国应该促进中小企业进行能源审计。此外,还列出了审计、培训以及电能效率提高的资金和补助。目标是各成员国能够共同达到2020年战略计划。How

我们是否能保证系统是合格的能效设备?

遵守法律要采用的一些步骤:

  • 及时进行电能审计。至关重要的合作伙伴:电能服务公司在这里会起到至关重要的作用,CIRCUTOR提供开放的合作模式,详情可洽询我们的销售网络
  • 确认推荐使用的能效功能,在对实际安装的系统通过投资回报以及方案质量进行环评检测。您将看到提高能效的目的已经达到了。
  • 告知和培训系统终端用户。用户的使用习惯将在节能工程中起到非常重要的作用。应该不定期的进行告知和培训,更应该定期更新以跟上科技进步,员工流动以及生活方式习惯的改变。RCUTOR同时有面对面以及线上培训两种方式。

在实施了审计的公司电能效率整体提升的结果是带来了很好的经济效益。此外公司还可获取的利益有:

  • 能源服务公司进行能源审计的是经过良好培训的有资质的员工,正如法律所规定的。
  • 能源安装公司设计、实施和监控能源效率以达到要求。
  • 电气输配电公司有资质的员工可为电能效率领域服务提供附加值。

无论您是必须遵守欧盟指令的公司,或是电气服务类公司,装配或电气设备经销商,CIRCUTOR均可称为您的合作伙伴,帮助您遵循法律并获取电能效率利益。


联系我们:
t. (+34) 93 745 29 00
 

CIRCUTOR 增强型电容器

提高电能效率的一个共同解决方案是校正功率因数,因此,电容柜就成为了关键元素。

增加强度

日益增长的用电成本和不断提高的环保意识促使我们提高电能效率。改善点能效率的一个通用方案是校正功率因数,因此,电容柜成为了关键元素。

近二十年来CIRCUTOR一直采用气体填充技术,与其他最先进的技术一起,使电容器成为市面上称之为增强型的电容器。电容器长时间可达1.8倍额定电流,达到2.5倍额定电流,并且峰值电流最高可达400倍额定电流。IEC-60831的D等级,低压电容器的生产标准,设置最大工作温度值在 55ºC,但CIRCUTOR增强型电容器的强度支持电容器在极限温度环境下工作,瞬时温度支持达到65ºC,另一个重要的特性是支持150,000小时使用寿命。所有的这些特性使得CIRCUTOR增强型电容器有很高的抗性和持久性。

With CIRCUTOR Heavy Duty, the key material is metallized polypropylene, which is always of European origin with the very highest performance features.

欧洲原材料更强的耐久性

因此这些增强型电容器可以适用于更为苛刻的工作条件,极限温度,工作电压和电流的波动,归功于CIRCUTOR选择的高质量原材料。在CIRCUTOR的增强型电容器中,最关键的材料是金属化聚丙烯,带有欧洲血统的最高性能特性。

CIRCUTOR加强型电容由惰性气体填充(干燥技术)能有效防止火灾和毒性物质泄露,同时还可降解,相对于填充油或者固态或半固态树脂,充气电容器不易于燃烧。其他气体填充的优点在于:

  • 与其他相同容量的电容器相比,增强型电容器同时节省了运费和所配的电池的成本,更好的节约了成本,最终用户与整个供应链共同达到了双赢的结果。
  • 提高了安全性,归功于更高效的内压安全阀保护系统。在没有液体溶剂(油)或固态填充物(热固性树脂)时,故障产生的情况下,电容器内部气体扩散直接作用于内压安全阀保护。
  • 无泄漏同时支持多种安装方案,适用于不同类型的柜体,最优化适用于每一位用户的最终解决方案。
  • 注重环保,因为电容器注入了无害的惰性气体,不含油性或其他有泄露风险的填充物。

CIRCUTOR增强型电容器承诺达到高水准的特性,最少的维护,保持温度达到150000小时的工作寿命。CIRCUTOR Heavy Duty capacitors saturated with inert gas (DRY technology) are very safe

耐久性和安全等级是重要因素

增强型电容器除了填充惰性气体以外,另一个优势是全金属化自愈的能力(figure 1),防止了电介质击穿后的漏电。这提高了在任何电网下的过压,工作温度过高,以及电网中需要补偿的谐波电流,甚至过多的投切操作次数的的耐受能力。Self-healing process of the metalized polypropylene

和其他任何材料一样,随着时间的推移,聚丙烯会发生化学改变。这会影响到电容器的电力因数。正因如此,电容器应该装备相应的保护系统,这样当有必要时,可以将其断开以避免影响到相邻元器件(电容器,投切设备,电抗器等)。在这方面,CIRCUTOR增强型电容器配备了泄压保护系统,当电容器内部压强高于506 hPa时,约(0.5 bar),系统将会启动,会将电容器从电网中断开,如 figure 2所示。Figure.2  The CIRCUTOR Heavy Duty capacitors have an overpressure protection system which is activated in case of any increase in internal pressure, disconnecting the capacitor from the network.
Figure.2 
CIRCUTOR增强型电容器配备过压保护系统,当电容器内部压强增大时,系统将故障电容器从电网中断开。

生产:质量的关键步

下一页中的figure 3展示了电容器的主要组成部分,填充了CIRCUTOR增强型电容器气体。

Figure 3
Figure 3

生产程序包含了CIRCUTOR任何产品生产的基本前提:最大限度保证质量和性能。在电容器的生产过程中有一些不得不提到的方面:

  1. 一旦电容芯被放置在铝管中,必须确保完全排除了这些组成部分中的任何可能存在的湿度,所以每只电容器都在真空环境下经历了一个漫长的真空处理程序。这是非常有必要的用于确保没有任何的湿度和氧气残存在电容器内部,可以有效的防止聚丙烯膜金属部分的氧化。这一防止氧化措施同时可避免电容器的快速衰减从而降低了了电介质损耗。减少了内部放电并提高了其整个工作寿命期间的容量。
  2. 在真空处理过后,电容器内部将会充满 N2 (氮气)以及He4(伴有4个原子质量的氦气同位素,其中有一个非常低的密度,是无色无臭无味的自然元素)的混合气体。再一次置于真空条件下,直到电容器内部压力微高于1013 hPa (1atm)。图片显示这一填充过程。
  3. 在图中可以看出,在填充和密封电容器过程中,电容罐顶盖已经装有一套端子用于将电容器连接到电网。这些端子内部已经装备了放电电阻,用于电容器放电,从电网中断开后 3分钟内达到小于75 (如图所示),符合应用标准IEC 60831-1所列明的。
  4. 在生产过程的最后将进行基本的性能测试以保证每只电容器的质量与性能:检查密封过程以保证内部气体没有泄露。如果检测到有任何泄露存在,这只电容器将会从生产过程中被取出。.
Figure 4 Capacitor filling and sealing process
Figure 4. 
电容器填充和密封过程
Figure 5 Terminals for connection to the network
Figure 5. 
用于将电容器接入电网的端子

结论

总而言之,我们可以提炼增强型电容器的优点,它是一个稳定的设备可以长时间耐受1.8倍额定电流,并在短时间内达到2.5倍额定电流,甚至峰值浪涌电流可达400倍额定电流,并保证使用寿命长达150000小时。这些特性支持了CIRCUTOR增强型电容器的高耐受性和长使用寿命。考虑到市场需求,CIRCUTOR有15000只增强型电容器储备,随时满足客户的订单需求。CIRCUTOR是在功率因数校正领域理想的合作伙伴,得益于我们生产的增强型电容器以及控制器。


点击此处下载PDF格式 pdf
本片文章: es  en  fr  de  pt  pl  以及
推广: es  en  fr  de  pt  pl
您也可以关注CIRCUTOR公众账号 Twitter ,以及 Linkedin.

电信系统电能效率管理

 

电信企业的关键问题

电信企业需要将其传统的管理系统转型为更为强大和高效的系统。现如今,在不同的中心使用独一点管理已经不再适用。成功的实现自动不同控制系统获取高质量应用是可靠并有效的。

在电信系统中需要时刻牢记的一点是供电的连续性,因为任何一点的故障都会引来用户的大量投诉,并需要员工去修复这一故障。因此,另一个总要的概念是管理人员可以远程的控制电能并且监管和控制每个站点来进行快速行动。

4 个重点目标


作为电能效率领域的标杆,CIRCUTOR提供电信服务公司广泛的产品用于成功的在远程站点以及数据处理中心达到高效控制他们的系统的目标。

要做到这一点需要记住几个目标,实例:

  1. 供电延续性
    通过保护和漏电自重合系统保证供电延续性.
  2. 电能效率管理
    保证系统的电能效率(控制和减少损耗)
  3. 报警管理
    效率管理报警 (入侵检测,信息,误操作等)
  4. 建立管理系统
    保证强大的不同中心的全球管理系统(集中控制)

怎样达到 4 个目标


1. 供电延续性

测量供电延续性是这类系统最关键的地方。任何断电都可能导致很大的经济损失并需要人员找出故障的解决方案。

缓解这一问题的解决方案是CIRCUTOR的带有超免疫的漏电保护以及自动重合RECmax断路系统。

超免疫漏电继电器系统保证了保护的正确进行,避免了由于误动作导致的故障。此外,采用直流供电,例如UPS,需要B型漏电继电器设备监管和保护系统。B型特别设计用于当直流和交流组件故障时确保出现漏电的正确操作。
相应的,自重合系统确保了临时故障时的供电延续性,不再需要进行外部干预。

需要说明的这些设备需要配备通讯来进行远程控制,实时监控保护状态并在需要进行维护或预防时进行相应操作。

安装控制设备,对于外部基础设施,例如TB-3,作为外部组件是特别值得推荐的。这些设计用于激活烧毁路灯的报警并被整合到管理和控制系统中去。

Article-telecom-continuidad-en

RECmax
带自重合系统和LCD显示的漏电保护断路器

RECmax LPd连接到WGC/WGS环形互感器保证在漏电,过载或短路跳闸后进行漏电短路保护并带自动重合闸。
这是对于由于地理位置原因难以控制和监管的基础设置最好的解决方案:

  • 电话系统
  • DTT 系统
  • IT 系统, UPS

RECmax. Earth leakage circuit breaker with self-reclosing system and display (LCD)

B型
B型全系列漏电保护和监管设备

CIRCUTOR的B型全系列漏电保护包含您系统中所有的保护等级。

Type B. Full range of Type B earth leakage protection and monitoring devices


2. 电能效率管理

所有需要提供电能效率的系统必须装有可以记录电气参数的设备,用于判断电能是在哪里和如何被损耗的。当所述数据被掌握后可以做出一个完整的分析并掌握电能效率不高的地方并量身定制一个修正方案以提高电能效率。
使用CVM,电能质量分析仪,做合理的记录,监管并管理电气损耗和不同中心的量。
为了正确管理,测量必须分段进行,测量系统电源和直接测量负载或设备。

  • 电源监控

    在电源侧监控损耗可以记录系统中心能源损耗,判断合同电量是否真正使用合理。因此,合同电量是第一个减少用电合同需要被获取的数据。

另一个优势是这可以进行自建计费,因为实时电能数据总是可用的,因此管理者可以预估官方发票收据。得益于此,会计部门才可以准确的预估开支。

无功电能罚单是不能被忽视的,这显而易见的增加了电费账单。这就是为什么必须安装电能质量分析仪,用于检测电容柜安装的容量,以避免每个月账单中没必要的罚款。

安装一个优化P&P(即插即用)系列电容柜将可以避免系统中心中的无功电能处罚,将会节约电费账单。

  • 监控设备

总的情况下,在电站或数据处理中心得出100%总电能损耗,其中60%是基础设施损耗的,剩下的40%是空调系统损耗的。

  • 空调

这说明了控制空调系统对于节约电费账单有很大的影响。必须安装温度和湿度互感器用于正确管理空气控制系统,从而操作风扇和空调系统。

关键是使用CIRCUTOR电能质量分析仪CVM或EDS电能管理器的数字输出,依据环境特性来打开或关闭风扇。当使用风扇不够达到温度条件,将开启空调系统,直到达到设置的参数点位。这一高效的有条理的使用冷却系统哒哒提高了环境部分的节能,即上述的总电能损耗的40%。

  • 照明

照明损耗管理已经成为全球性的不能忽视的问题。一个针对于这些损耗的分析系统是对于预估可能达到的照明系统节能效果是非常重要的。历史数据可用于对比各个中心安装的照明系统节能效果。

  • IT 设备

The European Commission also has a code of conduct for reducing the impact of data centres' growing energy consumption.

我们可以计算任何发电系统的电能效率通过对比电能的使用与总的系统电能需求。通过这些信息我们可以掌握电能效率最低的点所在,我们可以实现一个实质性的节能以及环保行动。

电能因数对于数据中心是非常关键的,它有自己的指示:电能使用效率(PUE)由绿色电网标准定义,这是一个全球环保机构,由超过175个国际知名公司组成。

欧盟也有也有减少数据中心日益增长的电能损耗影响的条款。

组委会建立了一个特别的公式用于计算PUE:

PUE = Total energy supplied / Energy for IT equipment

此外,美国环境保护署(EPA)提供以下PUE值作为参考:

Companies like Google have gotten the average PUE of their DPCs down to 1.22, and sometimes as low as 1.15.

      • 历史记录 2.0
      • 当前趋势 1.9
      • 优化操作 1.7
      • 最优实施 1.3
      • 最先进技术 1.2

因此,能够成功改善电能效率的关键在于测量每一个设备的损耗(空调,通讯设备,UPS电源,照明,温度等)通过电能质量分析仪CVM,可以采取适当的操作并获取更高的性能。


3. 报警管理

当中心或变电站有报警产生时,必须要由维护工进行干预。必须有快速,安全和有效的报警系统才能够及时反映并最小化操作成本。通讯公司通常会有自己的报警系统,发送报警信号通过SNMP信息(简单网络管理协议),意味着任何管理系统必须发送不同的报警信号到服务器。

电能数据服务器EDS,管理中心中安装的设备,将自动发送产生的任何报警到电信SNMP主服务器上。因此,设备将进行恰当的操作以减轻影响,无论是直接操作或通过远程管理。


4. 管理系统建立

当控制中心或变电站需求设备已经建立,必须设计全球化基础设施管理。基础设施必须有与各个中心交互的能力,而且,可以自动将存储的信息报告到全球可浏览的系统。

信息必须从源头导出到控制中心依据冗余数据结构。

The installation's architecture would be designed in three blocks

系统结构将被设计为三块:

  • 本地管理

正如之前所述,可以选择不同类型的设备以获取更高效率的电能管理环境。当选定设备以后,必须通过通讯和数据库连接到电能管理设备,例如CIRCUTOR的电能效率数据服务器(EDS)。

EDS服务器通过Scada实时监控和存储不同设备的变量,并控制变电站的输入/输出管理。同时可使用Ethernet或3G通讯(取决于不同型号)连接到调制解调管理系统。

必须注意的是EDS有能力管理中心中任何出现的报警,发送信息通过SNMP到电信公司的中心控制服务器。

Local management system

  • 调制解调管理

数据传输和处理是最为重要的概念之一必须被认清。为了系统能够正常工作,各个中心或变电站必须接入到性能更高的系统中达到集中化控制不同的中心。该系统自动请求所有存储在EDS管理器中的数据,并在各个设备中显示/管理状态。

为达到该目的,各个地方中心发送数据到一个带有PowerStudio Scada电能分析软件的调制解调服务器代替各个地方中心的集中控制。

PowerStudio Scada平台接受和存储所有存储的信息并随后发送到控制中心的管理软件。因此,大量信息存储到中心服务器不饱和扇区,使后续的管理更加高效同时保证数据冗余,数据存储到EDS管理器和PowerStudio Scada系统中。

各个中心或变电站的相关设备可以通过Scada应用被远程设置、控制和监控。

Intermediate management system

  • 管理控制中心

管理整个通讯基础设施必须从中心服务器着手以获取系统的全局概念。

这需要安装一个使用PowerStudio Scada Deluxe平台的服务器。这一全局平台将可以添加安装在中级管理器上的不同的PowerStudio Scada,从而可以从他们的数据库获取反馈并集中化管理整个基础设施。

换句话说,集中应用可以用于观察不同的中级服务器,将可以通过他们的自主管理和控制设备进行轮流显示并控制由不同的EDS控制的当地系统。

当集中平台建立起来以后,数据将被自动存储于服务器内,整个数据库可以被发送到已经安装好的其他系统中。这一应用可通过SQL,web服务器,XML(该模式需要通过转换模块)直接发送数据。

综上所述,EDS设备还可以直接发送报警到通讯公司的中心报警服务器通过SNMP,完美的整合这些设备到现有的基础设施中。

Control centre architecture


PowerStudio Scada is the energy management software from CIRCUTORPowerStudio Scada 是 CIRCUTOR 推出的一款电能管理软件

PowerStudio Scada 用于中转中心控制

PowerStudio Scada

  • 变量实时显示
  • 建立数据中心
  • 图表显示
  • 数据表格
  • 建立SCADA页面
  • 建立个性化报告
  • 发送和响应报警(事件)
  • XML 服务器
  • 导出数据(.txt, 以及 .cvs)

Scada PowerStudio/Deluxe 软件应用实例

Application examples of the Scada PowerStudio/Deluxe software

PowerStudio Scada DELUXE 从主要控制中心管理

PowerStudio Scada DELUXE

Power Studio Scada Deluxe + :

  • Modbus 通用驱动程序(可添加任何市面上带有Modbus通讯协议的设备)
  • OPC Client (服务器数据到 OPC 系统)
  • 多点 PSS (添加其他 PSS到信号控制和管理系统)

SQL DATA EXPORT

  • 转换数据到SQL并自动导出到第三方系统

WEEKLY PUE CALCULATION REPORT

系统整体结构应用实例

1. 本地管理
EDS + 控制和管理系统

2. 中间管理
带有PowerStudio Scada软件的服务器用于数据管理和控制等级Œ(1)本地系统

3. 控制中心管理
带有 PowerStudio Scada Deluxe 集中服务器用于控制中间等级管理 (2) 和等级本地管理系统(1).
数据管理系统用于SQL, XML 或 WEB.
管理SNMP报警系统从(1) EDS 设备.

Example of the system's global architecture

总结

作为致力于电能效率领域的公司,CIRCUTOR提供通讯公司需要的构架用于管理和控制所有中心或站点,并提供大量设备和文件,所有这些均用于提高电能效率。

总结,通过系统安装方案,通讯公司可以在以下区域进行改善:

  • 供电连续性安全.
  • 修正管理并减少冷却系统损耗.
  • 减少电气成本通过管理和不同负载的预防性操作.
  • 通过功率因数校正减少电气成本.
  • 提高功率使用效率 (PUE)指标,适应欧盟建议的排放等级.
  • 报警控制.
  • 自计费可预估电费账单.
  • 全球和集中化管理通讯基础设施(遥控站点或数据处理中心).
 

点此下载本文章的pdf PDF格式es  en  de  fr  pl  pt

 
 

更多信息关于漏电保护和自重合系统

 
 

更多信息关于过电流和漏电保护及自重合系统

 
 

更多信息关于过电流保护和自重合系统

 

您可以获取最新资讯最新资讯
您也可以关注我们的公众账号CIRCUTOR的 Twitter账号, 以及LinkedIn.

当监控变成监管

New CEM series of multifunction energy meters for DIN rail connection

In an increasingly globalized world it is essential to manage efficiently the electrical consumption. In addition, the steady increase in the price of energy creates to the users the need to find new formulas to manage their installations.

The new CIRCUTOR's CEM series of multifunction energy meters provides all the essential information about the different consumption habits of an installation, helping to save money, resources and improving the installation's electrical energy efficiency.

The information is the key for an efficient management

The information is the key for an efficient management

Why install a CEM meter?

The objective of the new modular CEM meters is to allow the user to understand the electrical installation behavior by recording real energy patterns in order to take correct decisions to reduce and manage its electrical consumption. Thus, the user gets all the relevant information about how, when and where the energy is consumed. With all that information, it is possible to have all the billing data before receiving the utility's official bill, allowing the user to share out the costs with the different areas in the installation.

The task of identifying the individual consumptions, in one installation, is an almost impossible exercise if sectorized measurements are not taken. Therefore, to allocate costs to processes, devices or areas, it is completely necessary to implement a solution able to report detailed information about the electrical consumption by subdivisions and/or individually. In addition, CEM meters register the energy monetary cost (Euro, Dollars,..) and kgCO2 emissions for each tariff.

As an added value, it's reduced space and easy installation on DIN rail avoids high investments in modifying the current installation. This makes the new CEM's ideal to be installed in any switchboard or existing machinery.

The importance of the MID approval (EN 50470)

The new CEM energy meters are certified according to the European Directive MID (EN 50470). This allows the meters to be used for economic transactions (internal energy invoicing).

The EN 50470 standard declares the design and manufacturing process control by an external laboratory, ensuring the meters quality and transmitting the confidence to the different end users.

Benefits

The new modular CEM meters are designed to be installed in any sector or application, always offering a wide range of advantages to the end user. Summarizing, three different areas of use can be defined:

  • Tertiary sector: Is common to find installations such as shopping malls, hotels, campsites, offices, airports or marinas where there is installed a single official utility meter which measures the total consumption of the installation. To allocate the real energy cost to the end users some formulas can be used but the most correct action would be to measure the real consumption, with high accuracy and individually.

Moreover, its reduced space with DIN rail connection makes its installation fast and easy in the existing switchboards.

 

Individual measurements allow a correct allocation of costs

Individual measurements allow a correct allocation of costs

  • Industrial sector: All industrial installations have an official billing meter installed on the main to measure and register the total energy consumption. However, this fact creates an ignorance of where, when and how this energy is consumed.

Registering the electrical consumption, the manager will be able to make the right decisions while connecting the different loads or starting processes, preventing simultaneous consumptions and maximum demand penalties. Moreover, the manager will have enough information to select the installation's most suitable electrical tariff.

As additional features, CEM meters register the energy cost (Euro, Dollar,...) and kgCO2 emissions for each tariff being key factors for understanding and improving the energy efficiency of the installation. Thus, by means of rigorous measurements, the operational manufacturing costs (OpEx) will improve.

The measurement requires precise knowledge, individually or sectorized, of each productive process

The measurement requires precise knowledge, individually
or sectorized, of each productive process

  • Condominium: There are some buildings where the neighbors share between them the total electricity bill without any control. In these cases, there is a meter installed on the main and the total consumption is paid by dividing the cost between the different tenants. Without an individualized measurement the distribution of costs may not be equal because it depends on the use of each tenant.

Installing the new modular CEM meters, the manager avoids possible complaints from the tenants. Therefore, installing individual meters together with the PowerStudio Scada software, the manager will be able to invoice customized bills to each tenant, even before receiving the official utility bill for the entire building.

Individual measurements transmit confidence to the different tenants

Individual measurements transmit confidence to the different tenants

The benefits for each sector can be summarized in the following table:

TERTIARY SECTOR/ CONDOMINIUM INDUSTRIAL SECTOR
  • Equitable energy cost allocation through individualized measurements (processes/tenants).
  • Possibility to communicate the CEM meters with PowerStudio Scada to invoice customized bills to each tenant.
  • Reduced space in DIN rail connection with easy and fast installation.
  • MID approval (EN 50470) ensuring the safety and meter accuracy
  • Improvement on operational costs due to the measuring and monitoring of real energy data.
  • Operational costs registration via Modbus/RTU by using Scada software.
  • Displays the energy costs (Euro, Dollar,..) and kgCO2 emissions on each tariff.
  • Prevents simultaneous consumptions and maximum demand penalties.
  • Helps to select the most suitable electrical tariff.
  • Reduced space in DIN rail connection with easy and fast installation

CEM meters with OSC communications

In order to perform the different energy consumption analysis, CIRCUTOR launches the new CEM series of multifunction energy meters for DIN rail connection with OSC communication system. The new range consists of single (CEM-C10) and three phase direct (CEM-C20) and indirect (CEM-C30) meters. All the meters have a single pulse output to send pulses in relation to the consumed or generated energy.

To provide communications to the system it is as easy as coupling an additional CEM-M module which communicates directly with a CEM meter through OSC system. This system consists of an optical window that allows optical communications between the meter and the CEM-M module without the need of any extra wiring. Furthermore, the CEM-M module has a wired RS-485 output to send the meter's information to our PowerStudio Scada software via Modbus/RTU to register and monitor all the relevant data such as energy consumption, voltage, current, power, power factor and frequency.

OSC communication system

OSC communication system

The solution: New CEM multifunction energy meters

The new range of modular CEM meters allows obtaining all the relevant information about the different consumption habits of an installation, helping to save money, resources and improve the energy efficiency of an installation.

The CEM range consists on single and three phase static meters to measure the Active energy with Class B/1 (EN 50470/IEC 62053-21) and Reactive energy Class 2 (IEC 62053-23) with DIN rail connection. Each one has a 7-digit LCD display with scrolling screens and two buttons (1 sealable) to show all energy variables.

The CEM-M module provides RS-485 communications with Modbus/RTU protocol, connecting through optical interface (OSC) to any CEM-C meter.

cem-c10  cem-c20  cem-c30  cem-m 
 2 modules  4 modules  4 modules  2 modules

CEM-C10

CEM-C20

CEM-C30

CEM-M

Single phase direct energy meter, up to 65 A Three phase direct energy meter, up to 65 A Three phase indirect energy meter .../5(10) A  Communication module for CEM energy meters
More information
More information
More information
More information
Medida de parámetros eléctricos  Electrical parameter measurement 
 V, A, kW, kW·h, kvar, cosφ
Sistema OSC    OSC System
Medida en 2 ó 4 cuadrantes Measurement in 2 or 4 quadrants Modbus/RTU (RS-485) Modbus/RTU (RS-485)
1 salida de impulsos Impulse output
 
Plug&play Plug&play     
Precintable Sealable  
Certificación MID    Clase B (IEC50470)  Clase 1 (IEC62053-21) MID Approval 
 Class B/1 (EN 50470/IEC 62053-21)
 

 


联系我们:
t. (+34) 93 745 29 00
 

漏电保护选择的3个基本原则

A large part of unwanted tripping in an installation is caused by a lack of selectivity coordination between the earth leakage protections. With good installation practices, we can solve a large part of the earth leakage protection tripping.

Selectivity in earth leakage protection must be both horizontal and vertical. In this article, we will deal with the 3 essential rules for vertical selectivity

3 conditions must be met in order to guarantee correct vertical selectivity:

  • Amperometric selectivity
  • Chronometric selectivity
  • Type selectivity

Amperometric selectivity

 Amperometric selectivity

 

This condition must ensure that the sensitivity value of the earth leakage protection connected upstream (I∆1) is more than double the sensitivity of the protection connected downstream (I∆2).

For example, with an earth leakage protection with a sensitivity of 30 mA (I∆2) we might have a protection of 100 mA (I∆1) or higher upstream.

Only with amperometric selectivity would we meet one of the three conditions, so the selectivity would only be partial.

  Amperometric selectivity

Chronometric selectivity

 Chronometric selectivity

 

This condition must guarantee that an earth leakage protection connected upstream (t1) does not act before a protection downstream (t2) to avoid any current value.

The response times must be kept below the safety limit times.

We will achieve total selectivity along with amperometric selectivity.

  Chronometric selectivity

Type selectivity

 Type selectivity

 

To guarantee vertical selectivity, the type of class or earth leakage protection upstream must be the same as or higher than the protection installed downstream.

Due to the ever-larger demand in earth leakage protections in installations, more and more type A and type B protections are required, which makes it necessary to respect the vertical selectivity according to the type installed downstream.

  Type selectivity

Selectivity requirements

With CIRCUTOR's RGU-2, RGU-10, RGU-10B and CBS4 earth leakage protections, we can adapt to the selectivity requirements of any installation. We can therefore easily adapt both to the necessary parameters of sensitivity and time.

Earth leakage protection

With a single earth leakage protection, we are able to protect a single load, a sub-panel or a general supply. All of this added to their ultra-immunity and high performance (prealarm, display and communications), make CIRCUTOR earth leakage protections the ideal option for any installation.

 

Francesc Fornieles Castells

Responsable de Mercados - División Gestión Energética y Calidad de Red
Markets Manager - Energy Management and Power Quality Division

circutor32x32

联系方式

CIRCUTOR, SA
Vial Sant Jordi s/n, 08232
Viladecavalls (Barcelona) Spain
Tel: (+34) 93 745 29 00
Fax (+34) 93 745 29 14

技术支持

(+34) 93 745 29 19

SAT